top of page

Basement Side Entrance
Begening of the work on encloced side entrance for separated basement suit.

Basement Entrance

Basement Entrance
Concrete block wall done and waterproof.

Basement Entrance
Steps and Sidewalk forming are done and ready to pour the concrete.

Basement Side Entrance
Foundation Concrete Cuting

Basement Side Entrance
The Opening Done

Basement Entrance
Started framing the enclosure

Basement Entrance
Framing and roofing work finished

Basement Entrance
Finishing the interiror insulation and drywall.

Basement Entrance
Exterior stucco , aluminum and eavestrough finished.

Basement Entrance
Final inspection in progress
bottom of page